W.AIRPORT WAY-DEPT over W.AIRPORT WAY-ARRIVAL
AT BOISE AIRPORT · County 001, Idaho · Built 2004 · 3 Lanes · 4,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
43.569861, -116.223444
This bridge is in worse condition than 89.1% of bridges in County 001. The average bridge in Idaho is 0 years old; this one is 22 years old.
Nearby Bridges
NHS 7433;VISTA AVE over I 84 EB-WB;VISTA AVE IC
Built 2010
STC 7393;OWYHEE ST over NEW YORK CANAL
Built 1997
NHS 7433;VISTA AVE over NEW YORK CANAL
Built 1973
I 84 WBL over NEW YORK CANAL
Built 1968
I 84 EBL over NEW YORK CANAL
Built 1968
STC 9623;W. WRIGHT over NEW YORK CANAL
Built 1989
STC 7233;ROOSEVELT over NEW YORK CANAL
Built 1975
STP8973;ORCHARD ST over I 84 EB-WB;ORCHARD ST IC
Built 2010
NHM 7683;ORCHARD over NEW YORK CANAL
Built 1990
US 20;BROADWAY over I 84 EB-WB;BROADWAY IC
Built 2015
Bridge Details
- Structure #
- 000000000034000
- Year Built
- 2004
- Length
- 305.7 m (1003 ft)
- Max Span
- 30.5 m
- Width
- 21.1 m (69.2 ft)
- Lanes
- 3
- Daily Traffic
- 4,000
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,617,000
- Total Project Cost
- $2,425,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.