STIBNITE ROAD over SALT CREEK

1.4 S. 6.7 E. YELLOW PINE · County 085, Idaho · Built 2010 · 1 Lanes · 30 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000033913
Year Built
2010
Length
7.6 m (24.9 ft)
Max Span
7 m
Width
5.3 m (17.4 ft)
Lanes
1
Daily Traffic
30
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$208,000
Total Project Cost
$312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.