ELK SUMMIT RD over PILOT CREEK
12.9 N 2.1 W YELLOW PINE · County 085, Idaho · Built 2003 · 1 Lanes · 15 vehicles/day
Overall
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 9 | Excellent |
| Substructure | 8 | Very Good |
Location
45.152028, -115.539194
This bridge is in worse condition than 9.8% of bridges in County 085. The average bridge in Idaho is 0 years old; this one is 23 years old.
Bridge Details
- Structure #
- 000000000033600
- Year Built
- 2003
- Length
- 17.4 m (57.1 ft)
- Max Span
- 16.5 m
- Width
- 4.3 m (14.1 ft)
- Lanes
- 1
- Daily Traffic
- 15
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $374,000
- Total Project Cost
- $561,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.