SMA 7288;HILL RD over FARMERS UNION CANAL
IN BOISE · County 001, Idaho · Built 1963 · 2 Lanes · 4,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.677889, -116.268528
This bridge is in worse condition than 47.4% of bridges in County 001. The average bridge in Idaho is 0 years old; this one is 63 years old.
Nearby Bridges
STC 9273;CASTLE DR over FARMERS UNION CANAL
Built 1992
STC 9693;SEAMANS G over FARMERS UNION CANAL
Built 1992
SMA7288;HILLRDPKWY over DRAINAGE DISTRICT NO. 2
Built 2001
SH 44 ;GLENWOOD RD over BOISE RIVER;GLENWOOD BR
Built 1995
STC9443;JOHNS LNDG over FARMERS UNION CANAL
Built 1977
STP7220;STATE ST over FARMERS UNION CANAL
Built 2019
WYLIE LANE over FARMERS UNION CANAL
Built 1999
SMA9803;MAPLE GRVE over SETTLERS CANAL
Built 2007
CHRISTINE STREET over SETTLERS CANAL
Built 1968
ALAMOSA LANE over FARMERS UNION CANAL
Built 1996
Bridge Details
- Structure #
- 000000000033415
- Year Built
- 1963
- Reconstructed
- 1981
- Length
- 8.5 m (27.9 ft)
- Max Span
- 7.6 m
- Width
- 20.6 m (67.6 ft)
- Lanes
- 2
- Daily Traffic
- 4,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $469,000
- Total Project Cost
- $704,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.