SILVERWEED WAY RD over TRAIL CREEK
IN SUN VALLEY · County 013, Idaho · Built 1965 · 1 Lanes · 100 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
43.6875, -114.354444
This bridge is in worse condition than 74% of bridges in County 013. The average bridge in Idaho is 0 years old; this one is 61 years old.
Nearby Bridges
BITTERROOT ROAD over TRAIL CREEK
Built 1965
DOLLAR ROAD over TRAIL CREEK
Built 1988
OLD DOLLAR ROAD over TRAIL CREEK
Built 2004
LEADVILLE AVE over TRAIL CREEK
Built 1980
BROADWAY BLVD over BIG WOOD RIVER
Built 2001
STC2815;WARM SPRNG over BIG WOOD RIVER
Built 1972
SECOND AVENUE over TRAIL CREEK
Built 1995
SERENADE LANE over TRAIL CREEK
Built 1995
ADAMS GULCH ROAD over BIG WOOD RIVER
Built 2018
ASPEN DRIVE over WARM SPRINGS CREEK
Built 1991
Bridge Details
- Structure #
- 000000000033310
- Year Built
- 1965
- Length
- 11 m (36.1 ft)
- Max Span
- 10.7 m
- Width
- 5.5 m (18 ft)
- Lanes
- 1
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $240,000
- Total Project Cost
- $360,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.