US 95 over E.FK. LAPWAI CREEK

4.9 N. 1.0 E. WINCHESTER · County 061, Idaho · Built 1957 · 2 Lanes · 3,600 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000000000033160
Year Built
1957
Reconstructed
1962
Length
16.2 m (53.1 ft)
Max Span
4 m
Width
17 m (55.8 ft)
Lanes
2
Daily Traffic
3,600
Material
Steel
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$508,000
Total Project Cost
$762,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.