N 2000 W over SPRING CR;N.FK.LEIGH CR

0.5 S. 1.0 E. TETONIA · County 081, Idaho · Built 1984 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000033085
Year Built
1984
Length
8.8 m (28.9 ft)
Max Span
8.5 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.