W 4000 N over WARM SLOUGH
3.8 N. 4.2 W. REXBURG · County 065, Idaho · Built 1968 · 2 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
43.891469, -111.877306
This bridge is in worse condition than 32.5% of bridges in County 065. The average bridge in Idaho is 0 years old; this one is 58 years old.
Nearby Bridges
W 4500 N over ST ANTHONY CANAL
Built 1990
STC 6760; W4000N over WARM SLOUGH
Built 1969
W 4000 N over ST ANTHONY CANAL
Built 1992
STC 6760;W4000N over N.FK.SNAKE R.;HIBBARD BR
Built 1968
W 6000 N over INDEPENDENT CANAL
Built 2002
E 300 N over ST. ANTHONY CANAL
Built 1978
N 1600 E over INDEPENDENT CANAL
Built 1973
2000 W over N.FK.TETON RIVER
Built 1977
E 300 N over EGIN CANAL
Built 1985
N 1600 E over EGIN CANAL
Built 1978
Bridge Details
- Structure #
- 000000000032850
- Year Built
- 1968
- Length
- 21.9 m (71.9 ft)
- Max Span
- 21.3 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $448,000
- Total Project Cost
- $672,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.