COTTOM LANE over LEMHI RIVER
7.2 S. 7.1 E. LEMHI · County 059, Idaho · Built 1950 · 2 Lanes · 70 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
44.749111, -113.475778
This bridge is in worse condition than 57% of bridges in County 059. The average bridge in Idaho is 0 years old; this one is 76 years old.
Nearby Bridges
SH 28 over LEMHI RIVER
Built 2018
SH 28 over LEMHI RIVER
Built 2018
LEMHI ROAD over LEMHI RIVER(HIGH BR)
Built 1992
LEMHI ROAD over CANYON CREEK
Built 2012
SH 29 over LEMHI RIVER
Built 1972
SH 29 over EIGHTEEN MILE CREEK
Built 2019
SH 28 over LEMHI RIVER
Built 2018
SH 28 over LEMHI RIVER
Built 2019
LEVEL C ROAD over E. FORK HAYDEN CREEK
Built 1974
LEMHI RD;OLD HWY28 over LEMHI RIVER
Built 1965
Bridge Details
- Structure #
- 000000000032720
- Year Built
- 1950
- Reconstructed
- 1968
- Length
- 12.5 m (41 ft)
- Max Span
- 11.9 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 70
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $277,000
- Total Project Cost
- $416,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.