1900 EAST RD over CAMAS CREEK

3.5 N. 6.0 E. TERRETON · County 051, Idaho · Built 1972 · 2 Lanes · 30 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000032320
Year Built
1972
Length
7.6 m (24.9 ft)
Max Span
7.3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
30
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$150,000
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.