E 400 N over INDEPENDENT CANAL
1.1 S. 1.4 W. PARKER · County 043, Idaho · Built 1960 · 2 Lanes · 580 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.941564, -111.786361
This bridge is in worse condition than 75.4% of bridges in County 043. The average bridge in Idaho is 0 years old; this one is 66 years old.
Nearby Bridges
STC 6770;SALEM RD over INDEPENDENT CANAL
Built 2011
STC 6770;SALEM RD over UNION CANAL
Built 2011
STC 6770; SALEM RD over EGIN CANAL
Built 2011
STC 6760;EGIN ROAD over EGIN CANAL
Built 1957
STC6770;SALEM RD over HENRYS FORK SNAKE RIVER
Built 2007
N 1800 E over INDEPENDENT CANAL
Built 1940
N 1800 E over ST. ANTHONY CANAL
Built 1975
N 2000 E over INDEPENDENT CANAL
Built 1962
E 500 N over ST. ANTHONY CANAL
Built 2010
STC 6760;E 400 N over EGIN CANAL
Built 1992
Bridge Details
- Structure #
- 000000000031990
- Year Built
- 1960
- Length
- 10.7 m (35.1 ft)
- Max Span
- 9.8 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 580
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $282,000
- Total Project Cost
- $423,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.