N2100E over CONSOLIDATED FARMERS CNL
2.7 W 2.5 S ST ANTHONY · County 043, Idaho · Built 2014 · 1 Lanes · 140 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 8 | Very Good |
Location
43.929083, -111.737778
This bridge is in worse condition than 2.9% of bridges in County 043. The average bridge in Idaho is 0 years old; this one is 12 years old.
Nearby Bridges
E 400 N over SALEM UNION CANAL
Built 2011
E 200 N over SALEM UNION CANAL
Built 2023
N 2000 E over CONSOLIDATED FARMERS CNL
Built 2018
N 2100 E over INDEPENDENT CANAL
Built 1976
N 2000 E over INDEPENDENT CANAL
Built 1962
N 2300 E over S. BRANCH WILFORD CANAL
Built 1997
N 1700 E (S TETON) over TETON ISLAND CANAL
Built 1964
E 200 N over FARMERS FRIEND CANAL
Built 2016
E PARKER MAIN ST over EGIN CANAL
Built 1960
N 2100 E over EGIN CANAL
Built 2010
Bridge Details
- Structure #
- 000000000031943
- Year Built
- 2014
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7.6 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 140
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $32,000
- Total Project Cost
- $48,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.