CAPITOL AVENUE over SWAUGER SLOUGH

IN MACKAY · County 037, Idaho · Built 1940 · 1 Lanes · 1,220 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 6 Satisfactory

Location

43.9115, -113.618964

This bridge is in worse condition than 32.5% of bridges in County 037. The average bridge in Idaho is 0 years old; this one is 86 years old.

Nearby Bridges

Bridge Details

Structure #
000000000031815
Year Built
1940
Reconstructed
1999
Length
7 m (23 ft)
Max Span
6.7 m
Width
6.2 m (20.3 ft)
Lanes
1
Daily Traffic
1,220
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$301,000
Total Project Cost
$451,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.