3175 NORTH over WEST SIDE CANAL

IN MOORE · County 023, Idaho · Built 1989 · 2 Lanes · 210 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000031551
Year Built
1989
Length
7.6 m (24.9 ft)
Max Span
7 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
210
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$199,000
Total Project Cost
$299,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.