STC 6706;HITT ROAD over NORTH FORK WILLOW CREEK
2.6 S. 1.0 W. UCON · County 019, Idaho · Built 1963 · 2 Lanes · 8,400 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
43.553403, -111.983811
This bridge is in worse condition than 78.4% of bridges in County 019. The average bridge in Idaho is 0 years old; this one is 63 years old.
Nearby Bridges
US 20 over ANDERSON CANAL
Built 1970
US 20 over WILLOW CREEK
Built 1970
US 20 EBL over STC 6706; HITT RD IC
Built 2005
US 20 WBL over STC 6706; HITT RD IC
Built 2005
US 20 WBL over STC 6708; ST LEON RD IC
Built 2005
US 20 EBL over STC 6708; ST LEON RD IC
Built 2005
SH 43 over WILLOW CREEK
Built 1994
STC 6706;HITT ROAD over RIRIE OUTLET CANAL
Built 2005
US 20 WBL over RIRIE OUTLET CHANNEL
Built 1974
US 20 EBL over RIRIE OUTLET CHANNEL
Built 1974
Bridge Details
- Structure #
- 000000000031260
- Year Built
- 1963
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7.6 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 8,400
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $363,000
- Total Project Cost
- $544,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.