129TH SOUTH ROAD over IDAHO CANAL

0.3 E. TAYLORVILLE · County 019, Idaho · Built 1952 · 2 Lanes · 960 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000031060
Year Built
1952
Length
9.4 m (30.8 ft)
Max Span
8.8 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
960
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$281,000
Total Project Cost
$421,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.