FIRST ST over BEAR CREEK;NW.CALDER BR

0.1 N. 0.1 W. CALDER · County 079, Idaho · Built 1960 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000030850
Year Built
1960
Length
11.3 m (37.1 ft)
Max Span
11 m
Width
6.5 m (21.3 ft)
Lanes
2
Daily Traffic
100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$273,000
Total Project Cost
$409,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.