POPLAR ROAD over W.FK.ST MARIES RIVER
AT CLARKIA · County 079, Idaho · Built 1957 · 2 Lanes · 340 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.011481, -116.254522
This bridge is in worse condition than 24.5% of bridges in County 079. The average bridge in Idaho is 0 years old; this one is 69 years old.
Nearby Bridges
CEDAR ROAD over M. FK. ST. MARIES RIVER
Built 1974
FS ROUTE 301 over ST MARIES RIVER
Built 1973
FS ROUTE NO. 301 over MERRY CREEK
Built 1954
SH 3 over ST MARIES RIVER
Built 1955
FS ROUTE NO. 447 over E.F. EMERALD
Built 2024
FS ROUTE NO. 447 over E.F. EMERALD CREEK
Built 2024
FS ROUTE NO. 301 over GOLD CENTER CR
Built 1986
NO DATA ENTERED over W.F. EMERALD
Built 2020
COUNTY ROAD over EMERALD CREEK
Built 1973
NO DATA ENTERED over DONKEY CREEK
Built 1952
Bridge Details
- Structure #
- 000000000030690
- Year Built
- 1957
- Length
- 18.3 m (60 ft)
- Max Span
- 18 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 340
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $388,000
- Total Project Cost
- $582,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.