EARL LANE over MOYIE RIVER

2.9 S. ADDIE · County 021, Idaho · Built 1981 · 2 Lanes · 30 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000030275
Year Built
1981
Length
31.1 m (102 ft)
Max Span
30.8 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
30
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.