RAPID LIGHTNING RD over RAPID LIGHTNING CREEK

3.3 S. 5.9 E. SAMUELS · County 017, Idaho · Built 1974 · 2 Lanes · 280 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000030210
Year Built
1974
Length
12.2 m (40 ft)
Max Span
11.9 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
280
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$307,000
Total Project Cost
$460,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.