POIRIRE RANCH RD over BLANCHARD CREEK

0.8 S. 0.8 W. BLANCHARD · County 017, Idaho · Built 1965 · 1 Lanes · 80 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 6 Satisfactory
Substructure 5 Fair

Location

48.004681, -117.002181

This bridge is in worse condition than 66.3% of bridges in County 017. The average bridge in Idaho is 0 years old; this one is 61 years old.

Nearby Bridges

Bridge Details

Structure #
000000000030165
Year Built
1965
Reconstructed
2014
Length
18 m (59.1 ft)
Max Span
17.4 m
Width
5 m (16.4 ft)
Lanes
1
Daily Traffic
80
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$380,000
Total Project Cost
$570,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.