CHERRY LANE over CLEARWATER RIVER

2.4 E. MYRTLE · County 069, Idaho · Built 2023 · 2 Lanes · 340 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000029961
Year Built
2023
Length
245.4 m (805.1 ft)
Max Span
71.6 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
340
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.