STC 7904;LENVILLE over S.FK.PALOUSE RIVER

1.3 S. 2.0 E. MOSCOW · County 057, Idaho · Built 2024 · 2 Lanes · 960 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000029681
Year Built
2024
Length
12.2 m (40 ft)
Max Span
11.3 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
960
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.