MDL POTLATCH CR RD over MIDDLE POTLATCH CREEK
0.7 N. 0.5 E. JULIAETTA · County 057, Idaho · Built 1940 · 2 Lanes · 30 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
46.589411, -116.722372
This bridge is in worse condition than 74.8% of bridges in County 057. The average bridge in Idaho is 0 years old; this one is 86 years old.
Nearby Bridges
SH 3 over M. FK. POTLATCH CREEK
Built 2021
MCGARY GRADE ROAD over POTLACH RIVER
Built 2016
SPERRY GRADE RD over POTLATCH RVR(SPERRY BR)
Built 1908
STC 4811;LENVILLE over LITTLE POTLATCH CREEK
Built 1973
SH 3 over BIG BEAR CREEK
Built 1954
S4795;GNSEE-JLETTA over LITTLE POTLATCH CREEK
Built 1977
LITTLE BEAR ROAD over BIG BEAR CREEK
Built 1959
SH 3 over LITTLE POTLATCH CREEK
Built 1988
STC 4771;SOUTHWICK over POTLATCH RIVER
Built 1995
STC 4811;LENVILLE over LITTLE POTLATCH CREEK
Built 1965
Bridge Details
- Structure #
- 000000000029510
- Year Built
- 1940
- Reconstructed
- 1960
- Length
- 16.2 m (53.1 ft)
- Max Span
- 7.6 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 30
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $342,000
- Total Project Cost
- $513,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.