S4815;FLNIGAN CRK over PALOUSE R;NW.POTLATCH BR
0.3 N. 1.0 W. POTLATCH · County 057, Idaho · Built 1940 · 2 Lanes · 220 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
46.925214, -116.921917
This bridge is in worse condition than 46.2% of bridges in County 057. The average bridge in Idaho is 0 years old; this one is 86 years old.
Nearby Bridges
US 95 over DEEP CREEK
Built 2022
ROCK CREEK ROAD over PALOUSE R;SE.POTLATCH BR
Built 1965
US 95 over WI&M RAILROAD
Built 2022
SCOVILLE ROAD over DEEP CREEK
Built 1965
US 95 over PALOUSE RIVER
Built 2002
ROCK CREEK ROAD over ROCK CREEK; SE POTLATCH
Built 1975
W. FREEZE ROAD over DEEP CREEK
Built 1970
SH 6 over GOLD CREEK
Built 2019
ONAWAY ROAD over GOLD CREEK
Built 1975
SOUTH RIVER ROAD over PALOUSE RIVER
Built 2000
Bridge Details
- Structure #
- 000000000029485
- Year Built
- 1940
- Reconstructed
- 1970
- Length
- 24.4 m (80.1 ft)
- Max Span
- 22.9 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 220
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $532,000
- Total Project Cost
- $798,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.