ELGIN ROAD over NOBLE CANAL
3.6S 4.4E NEW PLYMOUTH · County 075, Idaho · Built 1969 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
43.922108, -116.732856
This bridge is in worse condition than 61.5% of bridges in County 075. The average bridge in Idaho is 0 years old; this one is 57 years old.
Nearby Bridges
SE 3RD AVENUE over GRAVEYARD GULCH
Built 1968
ELGIN ROAD over DRAIN
Built 1965
ELGIN ROAD over FARMERS COOP CANAL
Built 1950
CASSIA ROAD over FARMERS COOP CANAL
Built 1959
BRILL ROAD over NOBLE CANAL
Built 1992
SE 4TH AVENUE over GRAVEYARD GULCH
Built 1969
LITTLE ROCK ROAD over NOBLE DRAIN
Built 1955
COUNTY LINE ROAD over NOBLE CANAL
Built 1966
STC 3830;DALLAS RD over DRAINAGE LATERAL
Built 1951
SH 52 over B LATERAL CANAL
Built 1990
Bridge Details
- Structure #
- 000000000028410
- Year Built
- 1969
- Length
- 8.2 m (26.9 ft)
- Max Span
- 7.9 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $217,000
- Total Project Cost
- $326,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.