S. EDISON ROAD over A LINE CANAL
1.8 S. 1.0 W. MARSING · County 073, Idaho · Built 1979 · 2 Lanes · 130 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
43.518358, -116.831333
This bridge is in worse condition than 75.5% of bridges in County 073. The average bridge in Idaho is 0 years old; this one is 47 years old.
Nearby Bridges
PERSHALL RD over B LINE CANAL
Built 1960
US 95 over B LINE CANAL
Built 1982
SH 55 over SNAKE RIVER (MARSING BR)
Built 2020
STC3730;MARSING RD over MORA CANAL
Built 2004
STC3710;SUMMER CMP over SQUAW CREEK
Built 1988
COOL ROAD over MORA CANAL
Built 1995
STC 3759;RIVERSIDE over MORA CANAL
Built 2024
US 95 over JUMP CREEK
Built 1982
WALKER LAKE ROAD over HIGH LINE CANAL
Built 1967
SH 55 over LOW LINE CANAL
Built 2007
Bridge Details
- Structure #
- 000000000028215
- Year Built
- 1979
- Length
- 7 m (23 ft)
- Max Span
- 3.4 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 130
- Material
- Prestressed Concrete
- Design
- Frame (except frame culverts)
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $194,000
- Total Project Cost
- $291,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.