RIVER RUN ROAD over E.FK.JARBIDGE RIVER
0.2S 0.1E MURPHY HOT SPR · County 073, Idaho · Built 1922 · 2 Lanes · 25 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.022972, -115.360028
This bridge is in worse condition than 75.5% of bridges in County 073. The average bridge in Idaho is 0 years old; this one is 104 years old.
Bridge Details
- Structure #
- 000000000028198
- Year Built
- 1922
- Reconstructed
- 2012
- Length
- 18.6 m (61 ft)
- Max Span
- 18 m
- Width
- 6.9 m (22.6 ft)
- Lanes
- 2
- Daily Traffic
- 25
- Material
- Steel
- Design
- Truss - Thru
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $384,000
- Total Project Cost
- $576,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.