STC 8001;MAIN ST over FARMERS COOP CANAL
IN EMMETT;MAIN ST · County 045, Idaho · Built 1940 · 2 Lanes · 1,300 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.875375, -116.50285
This bridge is in worse condition than 56.1% of bridges in County 045. The average bridge in Idaho is 0 years old; this one is 86 years old.
Nearby Bridges
W 2ND STREET over FARMERS COOP CANAL
Built 1930
GEM ISLND S ACCESS over PAYETTE RIVER TRIBUTARY
Built 2008
SH 52 over FARMERS COOP CANAL
Built 1992
STC7409;W 4TH ST over FARMERS COOP CANAL
Built 1960
WARDWELL STREET over FARMERS COOP CANAL
Built 1990
N. BOISE AVE over PAYETTE RIVER
Built 1996
SH 52 over PAYETTE RIVER;EMMETT BR.
Built 1971
STC7408;W 12TH ST over FARMERS COOP CANAL
Built 1965
SH 52 over FARMERS COOP CANAL
Built 2001
E 10TH STREET over LAST CHANCE CANAL
Built 2008
Bridge Details
- Structure #
- 000000000028180
- Year Built
- 1940
- Reconstructed
- 1950
- Length
- 7.9 m (25.9 ft)
- Max Span
- 4 m
- Width
- 17.6 m (57.7 ft)
- Lanes
- 2
- Daily Traffic
- 1,300
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $440,000
- Total Project Cost
- $660,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.