CASCADE ROAD over ENTERPRISE CANAL
0.6 S. 2.7;W. EMMETT · County 045, Idaho · Built 1950 · 2 Lanes · 950 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
44.035, -116.555
This bridge is in worse condition than 94.7% of bridges in County 045. The average bridge in Idaho is 0 years old; this one is 76 years old.
Nearby Bridges
SUCKER CREEK ROAD over BIG WILLOW CREEK
Built 1954
BIG FLAT ROAD over BIG WILLOW CREEK
Built 1970
DRY CREEK ROAD over LITTLE WILLOW CREEK
Built 1974
HILLVIEW ROAD over BISSEL CREEK
Built 1945
VAN DEUSEN RD over NORTHSIDE MAIN CANAL
Built 1969
STONE QUARRY over LITTLE WILLOW CREEK
Built 1950
STC 3838;PLAZA RD over PAYETTE RIVER;PLAZA BR.
Built 1959
GULCH ROAD over BIG WILLOW CREEK
Built 2011
STC 3830;FREEMONT over PAYETTE RIVER
Built 1961
Bridge Details
- Structure #
- 000000000028080
- Year Built
- 1950
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7.6 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 950
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $252,000
- Total Project Cost
- $378,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.