STC 3809;MIDDLE FK over QUEENS RIVER NO. 2
4.0 N. 4.0 W. ATLANTA · County 039, Idaho · Built 1962 · 1 Lanes · 30 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
43.821203, -115.207878
This bridge is in worse condition than 92.9% of bridges in County 039. The average bridge in Idaho is 0 years old; this one is 64 years old.
Nearby Bridges
QUEENS RIVER ROAD over QUEENS RIVER
Built 1965
STC 3809;MIDDLE FK over M.FK.BOISE RIVER(KIRBY)
Built 1991
STC 3809;MIDDLE FK over YUBA RIVER
Built 1965
YUBA RIVER ROAD over YUBA RIVER
Built 1976
FH 205;CHINA BASIN over M.FK. BOISE RIVER
Built 1958
STC 3809;MIDDLE FK over BLACK WARRIOR CREEK
Built 1975
E.FK.-FLY CK. ROAD over EAST FORK SWANHOLM
Built 1976
JAMES CREEK ROAD over ELK CREEK
Built 2007
PHIFER CREEK ROAD over M.FK.BOISE RIVER
Built 1968
Bridge Details
- Structure #
- 000000000027990
- Year Built
- 1962
- Length
- 19.2 m (63 ft)
- Max Span
- 18.3 m
- Width
- 6.1 m (20 ft)
- Lanes
- 1
- Daily Traffic
- 30
- Material
- Steel
- Design
- Truss - Thru
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $431,000
- Total Project Cost
- $647,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.