STC 3809;MIDDLE FK over M.FK.BOISE RIVER;LOFTUS

6.2 S. 12.1 W.DUTCH CR RS · County 039, Idaho · Built 1962 · 1 Lanes · 30 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 5 Fair

Location

43.725758, -115.602889

This bridge is in worse condition than 73.5% of bridges in County 039. The average bridge in Idaho is 0 years old; this one is 64 years old.

Nearby Bridges

Bridge Details

Structure #
000000000027900
Year Built
1962
Length
55.2 m (181.1 ft)
Max Span
22.9 m
Width
5.9 m (19.4 ft)
Lanes
1
Daily Traffic
30
Material
Steel
Design
Truss - Thru
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$1,064,000
Total Project Cost
$1,596,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.