STC7808;MIDDLETON over WILLOW CREEK

1.3 N. 0.3 E. MIDDLETON · County 027, Idaho · Built 1978 · 2 Lanes · 950 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000027395
Year Built
1978
Length
7 m (23 ft)
Max Span
6.7 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
950
Material
Prestressed Concrete
Design
Tee Beam
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$241,000
Total Project Cost
$362,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.