SMA 3686;JOPLIN RD over HIGH LINE CANAL

2.5 S. 2.6 E. MIDDLETON · County 027, Idaho · Built 1981 · 2 Lanes · 350 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000027375
Year Built
1981
Length
7.6 m (24.9 ft)
Max Span
7.6 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
350
Material
Concrete
Design
Frame (except frame culverts)
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$279,000
Total Project Cost
$419,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.