STC3762;GREENHURST over NEW YORK CANAL

3.0S 4.0E NAMPA CITY CTR · County 027, Idaho · Built 1972 · 2 Lanes · 2,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000026895
Year Built
1972
Length
17.1 m (56.1 ft)
Max Span
16.5 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
2,800
Material
Prestressed Concrete
Design
Tee Beam
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$746,000
Total Project Cost
$1,119,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.