E. CARMEL DRIVE over FIVE MILE CREEK

IN MERIDIAN · County 001, Idaho · Built 1996 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000026233
Year Built
1996
Length
16.8 m (55.1 ft)
Max Span
16.2 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.