JOPLIN ROAD over PHYLLIS CANAL

1.6 S. 1.0 E. STAR · County 001, Idaho · Built 1980 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000026115
Year Built
1980
Length
21.9 m (71.9 ft)
Max Span
21.6 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
200
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$448,000
Total Project Cost
$672,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.