SMA3343;COLUMBIA over RAWSON CANAL
2.8 N 3.3 E KUNA · County 001, Idaho · Built 1976 · 2 Lanes · 3,400 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
43.531911, -116.353769
This bridge is in worse condition than 89.1% of bridges in County 001. The average bridge in Idaho is 0 years old; this one is 50 years old.
Nearby Bridges
STP 3794;EAGLE RD over FARR LATERAL CANAL
Built 1993
STEWART ROAD over RAWSON CANAL
Built 1975
S3784;LOCUST GROVE over RAWSON CANAL
Built 1973
STC3728;LAKE HAZEL over FARR LATERAL CANAL
Built 1992
STC3768;HUBBARD over RAWSON CANAL
Built 1970
S3784;LOCUST GROVE over MASON CREEK FEEDER CANAL
Built 1969
STC3768;HUBBARD over MASON CREEK
Built 1992
S3784;LOCUST GROVE over FARR LATERAL CANAL
Built 1993
STC3795;CLOVERDALE over NEW YORK CANAL
Built 2014
STC3728;LAKE HAZEL over RAWSON CANAL
Built 2024
Bridge Details
- Structure #
- 000000000026108
- Year Built
- 1976
- Length
- 8.5 m (27.9 ft)
- Max Span
- 8.5 m
- Width
- 33.2 m (108.9 ft)
- Lanes
- 2
- Daily Traffic
- 3,400
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $356,000
- Total Project Cost
- $534,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.