SMA3343;COLUMBIA over RAWSON CANAL

2.8 N 3.3 E KUNA · County 001, Idaho · Built 1976 · 2 Lanes · 3,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000026108
Year Built
1976
Length
8.5 m (27.9 ft)
Max Span
8.5 m
Width
33.2 m (108.9 ft)
Lanes
2
Daily Traffic
3,400
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$356,000
Total Project Cost
$534,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.