SMA3613;MCMILLAN over PHYLLIS CANAL

3.0 S. 0.3 W. STAR · County 001, Idaho · Built 1967 · 2 Lanes · 1,300 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000025850
Year Built
1967
Length
11.6 m (38.1 ft)
Max Span
11.3 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
1,300
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$396,000
Total Project Cost
$594,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.