3200 EAST RD over LOW LINE CANAL

4.3 S. 2.5 E. TWIN FALLS · County 083, Idaho · Built 1968 · 2 Lanes · 190 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000025480
Year Built
1968
Length
34.7 m (113.8 ft)
Max Span
9.4 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
190
Material
Prestressed Concrete
Design
Channel Beam
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$675,000
Total Project Cost
$1,012,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.