CLOVER ROAD over CEDAR DRAW

0.5 W. FILER;JORDEN COR · County 083, Idaho · Built 1940 · 2 Lanes · 1,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000025465
Year Built
1940
Reconstructed
1965
Length
11 m (36.1 ft)
Max Span
9.1 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
1,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$326,000
Total Project Cost
$489,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.