3400 NORTH RD over HIGH LINE CANAL

7.4 S. 5.5 W. BUHL · County 083, Idaho · Built 1930 · 2 Lanes · 40 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000025455
Year Built
1930
Reconstructed
1974
Length
9.1 m (29.9 ft)
Max Span
8.8 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
40
Material
Prestressed Concrete
Design
Tee Beam
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$236,000
Total Project Cost
$353,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.