SMA7822;100 WEST R over C CANAL
0.3 N. 1.0 W. RUPERT · County 067, Idaho · Built 1971 · 2 Lanes · 2,100 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.622469, -113.687592
This bridge is in worse condition than 34.3% of bridges in County 067. The average bridge in Idaho is 0 years old; this one is 55 years old.
Nearby Bridges
SMA 7872; 8TH ST over B-4 CANAL
Built 1965
STC 7832;H STREET over C CANAL
Built 1965
STC 7832;H STREET over C CANAL
Built 1965
STC 7882;50 S. RD. over B-4 CANAL
Built 1941
SMA 7841;A STREET over B CANAL
Built 2014
SH 24 over B CANAL
Built 1983
SH 25 over B-4 CANAL
Built 2001
200 WEST ROAD over B-2 CANAL
Built 2020
SH 25 over A CANAL
Built 2000
100 NORTH ROAD over MAIN NORTHSIDE CANAL
Built 1975
Bridge Details
- Structure #
- 000000000025295
- Year Built
- 1971
- Length
- 13.1 m (43 ft)
- Max Span
- 12.8 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 2,100
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $641,000
- Total Project Cost
- $962,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.