FRONTAGE ROAD over N CANAL
0.6 S. 0.9 W. JEROME · County 053, Idaho · Built 1964 · 2 Lanes · 170 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.714514, -114.536481
This bridge is in worse condition than 6.3% of bridges in County 053. The average bridge in Idaho is 0 years old; this one is 62 years old.
Nearby Bridges
100 SOUTH ROAD over I 84;100 SOUTH RD GS 1
Built 1965
100 SOUTH ROAD over N CANAL
Built 1995
SH 25 over N CANAL
Built 2021
100 WEST ROAD over N CANAL
Built 2002
SH 25 over I 84 EB-WB;W.JEROME IC
Built 1966
I 84 over N CANAL
Built 1966
STC2765;BOB BARTON over N CANAL
Built 1973
I 84 EBL over J COULEE CANAL
Built 1966
I 84 WBL over J COULEE CANAL
Built 1954
SH 79 over I 84 EB-WB;S.JEROME IC
Built 1966
Bridge Details
- Structure #
- 000000000024575
- Year Built
- 1964
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7.6 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 170
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.