2300 EAST ROAD over LITTLE WOOD RIVER
0.2 S. 4.0 E. GOODING · County 047, Idaho · Built 1930 · 2 Lanes · 300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.939864, -114.633733
This bridge is in worse condition than 27.5% of bridges in County 047. The average bridge in Idaho is 0 years old; this one is 96 years old.
Nearby Bridges
1775 SOUTH ROAD over LITTLE WOOD RIVER
Built 1926
2200 EAST ROAD over LITTLE WOOD RIVER
Built 1940
US 26 over S.GOODING MAIN CANAL
Built 1967
US 26 over S. GOODING MAIN CANAL
Built 2008
2400 EAST ROAD over GOODING MAIN CANAL
Built 1933
2100 EAST ROAD over LITTLE WOOD RIVER
Built 2024
OLD HIGHWAY 26 over S.GOODING MAIN CANAL
Built 1932
2100 EAST ROAD over S. GOODING MAIN CANAL
Built 2024
2050 EAST ROAD over LITTLE WOOD RIVER
Built 1930
US 26 over S.GOODING MAIN CANAL
Built 1967
Bridge Details
- Structure #
- 000000000024470
- Year Built
- 1930
- Reconstructed
- 1991
- Length
- 9.8 m (32.2 ft)
- Max Span
- 9.1 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 2
- Daily Traffic
- 300
- Material
- Concrete
- Design
- Slab
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $214,000
- Total Project Cost
- $321,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.