2000 SOUTH ROAD over T.F.NORTHSIDE MAIN CNL
2.0 S. 0.5 E. GOODING · County 047, Idaho · Built 1930 · 2 Lanes · 160 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.909408, -114.703183
This bridge is in worse condition than 65% of bridges in County 047. The average bridge in Idaho is 0 years old; this one is 96 years old.
Nearby Bridges
SH 46 over X CANAL
Built 1958
2000 EAST ROAD over SOUTH GOODING MAIN CANAL
Built 2024
2000 EAST ROAD over X CANAL
Built 1930
US 26 over S.GOODING MAIN CANAL
Built 1967
US 26 over X CANAL
Built 1968
1850 S RD;14TH AVE over T.F.NORTHSIDE MAIN CNL
Built 1969
2100 EAST ROAD over S. GOODING MAIN CANAL
Built 2024
SH 46 over LITTLE WOOD RIVER
Built 1924
2050 EAST ROAD over LITTLE WOOD RIVER
Built 1930
2100 EAST ROAD over LITTLE WOOD RIVER
Built 2024
Bridge Details
- Structure #
- 000000000024325
- Year Built
- 1930
- Reconstructed
- 1963
- Length
- 9.4 m (30.8 ft)
- Max Span
- 9.1 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 160
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $240,000
- Total Project Cost
- $360,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.