2950 EAST RD over HEGLAR DRAIN
14.9 NE MALTA · County 031, Idaho · Built 2003 · 2 Lanes · 50 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.490278, -113.215
This bridge is in worse condition than 21.4% of bridges in County 031. The average bridge in Idaho is 0 years old; this one is 23 years old.
Nearby Bridges
S 2750 E over HEGLAR DRAIN
Built 1990
HEGLAR CANYON RD over HEGLAR DRAIN
Built 1984
IDAHOME ROAD over I 84 EB-WB;IDAHOME RD GS
Built 1967
BASELINE ROAD over RAFT RIVER
Built 2019
I 86 EBL over RAFT RIVER
Built 2019
I 86 EBL over COUNTY RD;OLD US 30N GS
Built 1960
I 86 WBL over RAFT RIVER
Built 2019
I 86 EBL over YALE ROAD;RAFT RIVER IC
Built 1960
I 86 WBL over COUNTY RD;OLD US 30N GS
Built 1960
I 84 WBL over RAFT RIVER
Built 1967
Bridge Details
- Structure #
- 000000000024188
- Year Built
- 2003
- Length
- 6.7 m (22 ft)
- Max Span
- 6.6 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.