AIRPORT ROAD over I 86 EB-WB;AIRPORT IC
5.7 W. CHUBBUCK · County 077, Idaho · Built 1968 · 2 Lanes · 1,300 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
4
Poor
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 4 | Poor |
| Substructure | 7 | Good |
Location
42.902028, -112.576986
This bridge is in worse condition than 98.6% of bridges in County 077. The average bridge in Idaho is 0 years old; this one is 58 years old.
Nearby Bridges
I 86 EBL over UPRR;POCATELLO AIRPORT
Built 1968
MICHAUD ROAD over TAGHEE CANAL
Built 1973
US 30 ;W. POKY IC over I 86;WEST POCATELLO IC
Built 1968
IRR BIA RTE 152 over PORTNEUF RIVER
Built 1960
I 86 EBL over PORTNEUF RIVER
Built 1968
BATISTE ROAD over PORTNEUF RIVER
Built 1968
I 86 WBL over PORTNEUF RIVER
Built 1968
STC 1718;ARBON VLY over I 86;TRUCKERVILLE IC
Built 1972
ELEVATOR LOOP RD over BANNOCK CREEK
Built 2008
US 30 over PORTNEUF RIVER
Built 2000
Bridge Details
- Structure #
- 000000000023645
- Year Built
- 1968
- Length
- 95.1 m (312 ft)
- Max Span
- 21.6 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 1,300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,345,000
- Total Project Cost
- $35,175,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.