CHUB FLAT RD. over MEADOW CREEK

7.6 W. WAYAN · County 029, Idaho · Built 1972 · 1 Lanes · 2 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 7 Good

Location

42.976889, -111.52725

This bridge is in worse condition than 77.8% of bridges in County 029. The average bridge in Idaho is 0 years old; this one is 54 years old.

Nearby Bridges

Bridge Details

Structure #
000000000023213
Year Built
1972
Length
13.1 m (43 ft)
Max Span
12.5 m
Width
5.1 m (16.7 ft)
Lanes
1
Daily Traffic
2
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$240,000
Total Project Cost
$360,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.