CHUB FLAT RD. over MEADOW CREEK
7.6 W. WAYAN · County 029, Idaho · Built 1972 · 1 Lanes · 2 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
42.976889, -111.52725
This bridge is in worse condition than 77.8% of bridges in County 029. The average bridge in Idaho is 0 years old; this one is 54 years old.
Nearby Bridges
Bridge Details
- Structure #
- 000000000023213
- Year Built
- 1972
- Length
- 13.1 m (43 ft)
- Max Span
- 12.5 m
- Width
- 5.1 m (16.7 ft)
- Lanes
- 1
- Daily Traffic
- 2
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $240,000
- Total Project Cost
- $360,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.