MCDONALDVILLE ROAD over PEOPLES CANAL

2.1 N. 0.2 W. GROVELAND · County 011, Idaho · Built 1999 · 2 Lanes · 190 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000022906
Year Built
1999
Length
10.1 m (33.1 ft)
Max Span
10.1 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
190
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.